Urgent diagnostics are required following an emergency pressure surge in the column, together with replacement of the damaged internals of the atmospheric column at the CDU/VDU unit.
Spliteks solution:
Design and engineering
Expedited manufacturing at the facility in Serpukhov
Delivery of the batch to the customer’s site
Result
Supply of 40 tonnes of column internals within 1 month after order placement